Foreman's amylase and Lipase are way up (way down??)
note to self:
Pull up the last lab, what were my amylase+Lipase doing?
Foreman had a parasite from water attacking his brain.
(I've got a moldy rug with water in it)
Anyway, Amylase and Lipase won't worry people unless it goes outside 30-160.
Waitasec, I need a pic to prove it.
Let's assume your friendly neighborhood underpaid tech (or their computer) wasn't lazy that day.
Nobody wants to handle blood, they give it to labs to test.
The lab gives it to a machine to test.
The machine spits out results like a calculator on a little receipt.
Buy a damn machine (if you're richer than god) and you too could know the secret mysteries of your blood.
One of the things "House" seems to preach is that people can be dying and have results that look normal. "If only someone had actually looked at the blood", but some bored doctor tested me for parasites, and I didn't have any to speak of (if you're hankering for a private hospital room, parasites might help)
But, (uh) what if your amylase is normal, but your poo is too full of fat??
I know this means something, I just don't know what.
Consider the healthy pancreas whose host (your body) is having problems with.
You know for a fact that, when you eat starchy food, your blood sugar skyrockets.
You Also know you're pooing too much fat ("Pooing" is a word??)
| Not very helpful.. I'll keep looking |
| OK NOW you're just showing off. Can't I flush it with chicken soup? Some spice? |
Pain or itching (one vs the other).
I'm supposed to call some vascular test-place, the same place some reviewer wrote was the worst in the area.
Oh, well...maybe I'll get lucky and the machine they use to test me will be all obvious.
I really need to call them...someday I will, I swear.
| mostly women get sick on internet |
No comments:
Post a Comment